Vendor Visits

Key takeaways

  • Open a visit record with the work order, trade, and authorizing person.
  • Limit the access window and name the rooms the contractor may enter.
  • Photograph the work area before and after the repair.
  • Close with a working test, a named signoff, and the invoice on file.
Talk through the executive workflow that needs clearer ownership.

Bring the recurring tasks, handoffs, and access boundaries you want dependable support to manage.

Talk with our team

Operating data

Primary workflowVendor Visits
Reading time5 minutes
Internal next steps3 links
External citation1 source

Playbook

Open a visit record before the contractor arrives

A contractor visit starts before the technician reaches the door. The coordinator should open a record with the work order number, the property, the trade, and the person expected. The record should also name who authorized the visit and what the contractor is allowed to touch. A plumber called for a leak should not open a closet that belongs to the owner's stored files.

Send the contractor the access instructions, the parking rule, and the contact for the day. If the unit is occupied, confirm the guest's permission and the time window in writing. If the visit is an emergency, note who approved the after-hours call. The record should exist before the technician arrives so the visit has an owner.

Limit the access window and the rooms in scope

Limit the access window to the hours the contractor actually needs. A four-hour window for a twenty-minute filter change gives the technician room to arrive late and still finish before the cleaner. If the guest is present, tell them when to expect the knock and how the contractor will identify themselves. The window should be specific enough to plan around.

Name the rooms in scope and the rooms that are off limits. A contractor working on a bathroom should not need the bedroom closet or the owner's storage bin. If the work requires shutting off water or power, tell the guest and the cleaner before the visit. The scope should be short enough to repeat at the door.

Photograph the work area before and after

Photograph the work area before the contractor starts and after the work is complete. The before photo shows the condition the property handed over; the after photo shows what changed. Keep the photos in the visit record with the timestamp and the work order number. A photo taken from the doorway is usually enough unless the damage is behind a panel.

If the contractor moves furniture or removes a fixture, ask for a photo of the area before it is covered again. If the work creates dust, confirm that the cleaner knows to wipe the surfaces. The photos should be part of the handoff to the next cleaner, not a separate album on someone's phone. A short visual record prevents a damage dispute later.

Capture the work order and the parts used

Capture the work order number, the diagnosis, and the parts the contractor used. If a part was replaced, record the model and whether the old part was left on site. If the contractor recommends a follow-up visit, write the reason and the deadline. The record should distinguish work that was completed from work that was only quoted.

Talk through the executive workflow that needs clearer ownership.

Bring the recurring tasks, handoffs, and access boundaries you want dependable support to manage.

Talk with our team

Ask for the invoice or the service ticket before the technician leaves. The invoice should match the work order and the parts list, and any difference should be explained. If the contractor cannot provide a ticket, note that in the record and follow up the same day. A missing ticket is harder to resolve after the technician has moved to another job.

Close the visit with a test and a signoff

Close the visit with a test that matches the work. A repaired lock should be tested with the guest code and the cleaner code; a repaired faucet should run hot and cold water; a replaced smoke detector should chirp once when tested. The person who signs off should be named in the record. A verbal okay from the guest is not a substitute for a test.

Tell the guest what was fixed and whether anything changed about the unit. If the contractor left a mess, send the cleaner back before the guest returns. If the repair is temporary, say so and give the date for the permanent fix. The closing message should leave the guest with a clear picture of the room.

Review repeat visits and access exceptions

Review contractor visits monthly by trade, property, and repeat issue. A property with three visits for the same leak needs a different repair, not another service call. A contractor who frequently arrives outside the window may need a new scheduling rule. The review should compare the invoice with the work order before approving payment.

Track access exceptions, such as a missing key, a guest who refused entry, or a technician who arrived without notice. Each exception should name the person who resolved it and the time. If the same exception repeats, change the access instructions or the contractor. The record is only useful if someone reads it before the next visit.

Keep a contractor list with access notes

A short list of approved contractors with their trades, insurance dates, and access notes saves the coordinator from searching at the moment of a leak. The list should note who can enter a unit alone and who needs a staff escort. It should also record the after-hours contact and the payment method. A list that is reviewed twice a year is more useful than a folder of old invoices.

When a new contractor is added, walk them through the property's access rules before the first visit. Confirm that they know where to park, how to reach the coordinator, and which rooms are off limits. Add the visit to the record even when the work is a favor for the owner. The first visit sets the pattern for every visit that follows.

Related services

- Property documentation - Owner reporting - Turnover coordination

Sources

- OSHA workplace safety guidance

Talk through the executive workflow that needs clearer ownership.

Bring the recurring tasks, handoffs, and access boundaries you want dependable support to manage.

Talk with our team

FAQ

When should a leader delegate this workflow?

Delegate it when repeated coordination, routing, or follow-up is taking time away from decisions that only the leader can make.

What should the assistant own first?

Start with intake rules, status visibility, and escalation timing so the assistant can act consistently before the workflow expands.